Power Plant Construction Project 35 Thousand Megawatt
The
Power Plant Construction Project 35 Thousand Megawatt
By
Muhammad Izzzah Ramadhan
Information
System/10151032
President Joko Widodo (Jokowi)
recognizes that the power plant construction project 35 thousand Megawatt (MW)
is an ambitious project of the government. But according to Jokowi, does
not mean that the project is not realistic. Given the demand for electricity in
Indonesia is very large, then Jokowi asked that the project was on target.
"Many have said that the 35 thousand MW project was an ambitious target.
But indeed it needs as it is. Therefore, the figure of 35 thousand MW if there
is a problem in the field, that's what investors look for solutions so that
investment can really carry out the investment, "said Jokowi at JCC,
Senayan, Central Jakarta, Wednesday (19/08/2015).
Related the
statement of the Coordinating Minister of Maritime Rizal Ramli, who called the project could not be achieved within
five years of the reign of Jokowi-JK, President Jokowi would say that
the project will cost up to
hundreds of trillions of rupiah it as a challenge for ministers. Members
of the National Energy Agency (BEN), Professor Tumiran said, to realize the
ideals of 35,000 Mw of electrical energy supply is not an easy task. Therefore,
to make it happen should be backed up with a comprehensive policy on all fronts
so that the program is running according to the stages and expectations. According to my own personal opinion I was agree with the
president's decision Jokowi Widodo with power plant
project of 35 thousand megawatts.
The first reason that
project must be
run because it is huge and growing countries need such as Indonesia. We
should realize that the electrical capacity that now exists in Indonesia is not
sufficient to supply the entire needs of the people and companies
that exist in Indonesia. Even if we look around there are scheduling blackouts,
even the big cities such as Balikpapan and
Tenggarong who that got the rotating blackouts by
PLN to cover the electricity consumption is at above the limit.
The second reason why this program needs to keep running
are still many areas in Indonesia that still hadn't
electricity. There are
still many remote areas that have not even completely
can enjoy the power which is only to illuminate
the lights at night. This issue is the central issue How
to the distribution of development in
Indonesia process must occur at the initial step
equitable distribution of electrical energy. Indonesia should be the Developed Countries and Developed
Countries must to be
high-tech State and high-tech State shall be entitled to an adequate backup
source of electricity.
From
two point above that
has to be a priority obligation and the requirement
to implement the Program Power 35 thousand Megawatts (MW). We can see it from the immediate
requirement in Indonesia is that it requires the construction of large power.
It is time now for us to move is not the time for Indonesia to complain but the
time for Indonesia to work, work and work. The last thing I want to convey this electrical energy’s
program is very useful and beneficial programs must occur
to process.
Words : 517
Sources :
http://bisnis.liputan6.com/read/2296969/jokowi-proyek-35-ribu-mw-harus-tetap-dilaksanakan
http://economy.okezone.com/read/2016/05/18/320/1391509/proyek-energi-listrik-35-000-mw-perlu-dievaluasi
Komentar ini telah dihapus oleh pengarang.
BalasHapusvery benefit (y)
BalasHapusyeah I totally agree with you there is still some part in Indonesia hasn't have electricity. perhaps Indonesia's government need to start in a solar powered electricity.
BalasHapusI agree with your conclusion, because there are still people in Indonesia who need electricity especially the inland areas.
BalasHapusMaybe more on priotias we need to heed that way to make the project can be done to the maximum and the outcome of the project can be felt in your own community.
BalasHapus